Johnstone's Hill Tunnel ITS

E-mail Print PDF

Johnstone’s Hill Tunnel ITS

ASL were chosen by the Northern Gateway Alliance to supply and install the key ITS components for the tunnel and its feeder motorway, included in this were twenty GSM emergency telephones, eighteen VoIP tunnel emergency telephones, eight heavy duty lane use signals incorporating fire and heat proof materials for tunnel operation and four large variable message signs with dual NTCIP and tunnel system control. In 2010 the Auckland Motorway Alliance took over the operation and maintenance of the tunnel with Armitage AMA staff managing and maintaining all tunnel operation systems including both ITS and fire protection.

Installing Tunnel Portal Type B VMS Tunnel Site Acceptance Testing

Installing Tunnel Portal Type B VMS Tunnel Portal VMS During Tunnel Site Acceptance Testing 2009

AMA Team

AMA Team Completing Johnstone’s Hill Tunnel Planned Preventative Maintenance

 

You are here